Skip to content

ApuTime

The ApuTime modules enable you to create, update, retrieve, delete, or search projects and tasks in your ApuTime account.

Prerequisites

  • An ApuTime account

In order to use ApuTime with Ibexa Connect, it is necessary to have an ApuTime account. If you do not have one, you can create an ApuTime account at https://www.aputime.com/.

Note

The module dialog fields that are displayed in bold (in the Ibexa Connect scenario, not in this documentation article) are mandatory!

Connecting ApuTime to Ibexa Connect

To connect your ApuTime account to Ibexa Connect you need to obtain your Application Name and API Key.

  1. Log in to your ApuTime account.

  2. Click your profile icon in the top-right corner and then the Settings icon.

    61f2671b70756.gif

  3. Click Get API Key.

    61f2671e07869.gif

  4. Copy the Application Name and Access Token to your clipboard.

    61f2672023f35.png

  5. Go to Ibexa Connect and open the ApuTime module's Create a connection dialog.

    61f267210a12c.gif

  6. In the Connection name field, enter the connection name.

  7. In the Application Name and API Key fields, enter the application name and API key copied in step 3 respectively.

    61f267231ef5a.png

  8. Click Continue.

The connection has been established.

Project

Watch Projects

Watches for each change on the project at a specified time.

Limit The maximum number of projects Ibexa Connect should return during one scenario execution cycle.

Create a Project

creates a new project which can be empty or from a template.

Project Name

Enter a name for the project.

Postpone

Enter the date to which the project is postponed or moved.

Deadline

Enter the date when the project must be completed.

Template

Select the project template.

AI Scheduling

Select whether the project's updates were scheduled using AI:

  • Enabled

  • Disabled

Get Project Detail

Returns of the project with a lot of useful information such as predictions which is your CRM greedy for.

Project ID Enter the Project ID whose details you want to retrieve.

Update a Project

Updates an existing project.

Project ID or CODE

Enter the Project ID or Project Code which you want to update.

Project Name

Enter a new project name.

Postpone

Enter the date to which the project is postponed or moved.

Deadline

Enter the date when the project must be completed.

AI Scheduling

Select whether the project's updates were scheduled using AI:

  • Enabled

  • Disabled

Task

Watch Tasks

Watches for each change on the task at a specified interval.

Limit The maximum number of tasks Ibexa Connect should return during one scenario execution cycle.
Query Predicates or full text Enter the query string or full name of the task you want to watch.

Create a Task

Creates everything the task should have.

Task name

Enter a name for the task.

Project

Select the project to which the task belongs to.

Description

Enter the details of the task.

Labels

Enter the applicable labels for the task. For example, bug, production, and so on.

Type

Select the task type.

Deadline

Enter the date by when the task must be completed.

Postpone

Enter the date to which the task is postponed or moved.

Estimated time value

Enter the time estimated for the task.

Estimated time unit

Select the unit for the time:

  • Minutes

  • Hours

Get Task Detail

Returns detail of the existing task.

Task ID Enter the Task ID or Task Code whose details you want to retrieve.

Update a Task

Updates an already existing task.

Task ID or CODE

Enter the Task ID or the task code of the task you want to update.

Task name

Enter a name for the task.

Project

Select the project to which the task belongs to.

Group Cooperation at the same time?

Select whether the task is assigned to a group or an individual:

  • Yes

  • No

Participants

Select the participants to assign the task.

Solver

Select the user to assign the task.

Labels

Enter the applicable labels for the task. For example, bug, production, and so on.

Type

Select the task type.

Deadline

Enter the date by when the task must be completed.

Postpone

Enter the date to which the task is postponed or moved.

Estimated time value

Enter the time estimated for the task.

Estimated time unit

Select the unit for the time:

  • Minutes

  • Hours

Attach a Google Drive File

Attaches a Google Drive file to a task.

Task ID Enter the Task ID to which you want to attach the file from Google Drive.
File ID Enter the File ID you want to attach to the task.
File Name Enter the file name.
Public Link Enter the shareable link to attach to the task and the user can access it. See the Google Drive Help to share the link.
MIME Type Enter the media type of the file you want to attach to the task. For example, HTML, PDF, and so on.
File Size Enter the file size. For example, 2 MB.

Task List

Show Plan

Returns current schedule.

Show Plan only for me Select to view only your task plans.
Number of returned tickets The maximum number of tasks Ibexa Connect should return during one scenario execution cycle.

Search Tasks

Searches by the query string. It uses full text search and very powerful query language as well.

Query predicates or full text

Select or enter the query to search for the tasks.

Order

Select the order in which you want to list the searched tasks.

By

Select the option to list the tasks:

  • DESC - Descending Order

  • ASC - Ascending Order

Number of returned tickets

The maximum number of tasks Ibexa Connect should return during one scenario execution cycle.

itemizedlist">

  • DESC - Descending Order

  • ASC - Ascending Order

Number of returned tickets

The maximum number of tasks Ibexa Connect should return during one scenario execution cycle.